A self-powered AI data center, built like LEGO.
Prefabricated IT, power and cooling modules with on-site CCHP generation — designed, factory-built, shipped and commissioned as one turnkey product.
The integrated solution for speed and power.
Prefabricated modular assembly
Cooling, power and IT systems are manufactured in parallel in our factory, cutting production lead time by up to 80%.
On-site natural gas power
Bypass grid delays entirely with a dedicated, high-efficiency CCHP power source — deploy anywhere, anytime.


Engineered for the densest AI workloads.
High-density ready
30–100 kW per rack, compatible with the latest GPUs.
Advanced liquid cooling
Cold-plate or immersion — far more effective than air.
Unmatched efficiency
Power Usage Effectiveness target below 1.2.
Mission-critical reliability
Tier III or Tier IV compliant design options.
Snap-together building blocks
8 standard modulesBypassing the grid with independent, high-efficiency power.
Combined Cooling, Heating & Power: a Jenbacher gas engine generates electricity, while its waste heat drives an absorption chiller that cools the data center.
Modular & skid-mounted
Pre-packaged Jenbacher units delivered in containers for rapid deployment.
Plug-and-play
Simplified on-site connection cuts commissioning to just 4–5 days.
Tier IV reliability
On-site generation with grid backup beats a dual-circuit grid connection (<7s downtime).
Green & efficient
Waste heat powers cooling, lowering PUE. Over 40% less CO₂ than coal power plants.
How we guarantee speed and certainty.
Digital de-risking
BIM and CFD simulation of the entire facility before manufacturing eliminates construction risks and thermal issues.
Parallel manufacturing
Automated production managed by PLM and ERP systems builds all subsystems simultaneously — impossible in linear construction.
Project as a product
We deliver a fully tested, pre-assembled product — not a construction project — radically reducing reliance on site labor.
Blueprint to power-up in 9 months.
-
01MONTHS 1–6
Factory manufacturing
All modules — IT, power, cooling — are precision-built and fully tested in parallel.
-
02MONTHS 7–8
Global logistics
Standardized modules are shipped to your site.
-
03MONTH 9
On-site assembly
LEGO-like assembly, system connection and power-up. From site delivery to live operations in one month.
Win the race to market
Deploy in 9 months, not 3 years. Capture share and reach ROI faster.
Build with certainty
Factory precision removes on-site delays, labor bottlenecks and overruns.
Scale at the speed of AI
Start at 10 MW and add capacity precisely when you need it.
Peak performance
Purpose-built for next-generation AI workloads.
Let’s build the future. Faster.
For any request or inquiry — technical deep dives, modular layouts, specification packages or compute off-take — contact our sales team.